OT cyber security and critical networks for rail, energy, oil and gas.
Assessed, designed and built to IEC 62443 by operational network, SCADA and OT security engineers.
ISO 27001. ISO 9001. ISO 45001. Cyber Essentials Plus.
Information security, quality, health and safety, and UK government-backed cyber assurance. Held by IP Global Services, applied to every job.
How an attacker reaches the trains, and what stops them.
Phishing on an office PC
Malware spreads across a flat network from the office to the SCADA server, then to the interlocking.
Compromised vendor laptop
A supplier's standing VPN account gives a route straight into the control system, past the firewall.
USB on an engineering laptop
The laptop has legitimate access to program the PLC. Segmentation lets it through, because it has to.
One team, accountable from design to handover.
Operational estates run thirty-year assets next to new IP systems, and they are now connected to corporate IT. When several suppliers share one environment, accountability splits the moment something goes wrong.
IPGS runs operational technology as a separate discipline, staffed and billed apart from its telecoms and enterprise IT work. It is the group's flagship practice. The same engineers carry a programme from the zone model to commissioning.
- We deliver itA defined scope under one contract, direct or through your prime contractor: from a signalling network design and CRE package to a full assess, design and build programme. Our engineers hold the design authority and sign the deliverables.
- We assure itOn the client's side: review and challenge of supplier designs, security requirements traced to evidence, risks stated plainly.
- The group behind itPenetration testing, SOC monitoring and telecoms core and RAN engineering from other IPGS practices, under the same contract.
Assess. Design. Build.
Most OT security suppliers stop at the report. We design the network and we build it. Watch what each phase does to an estate.
What is connected, what is exposed, what to fix first.
- Zone and conduit model with a target security level per zone, to IEC 62443-3-2
- Threat and consequence register, ranked by operational impact
- Review of the network as built: segmentation, single points of failure, remote access paths
- NIS / CAF gap analysis and the evidence pack the regulator expects
Security requirements per zone, and the network that meets them.
- Signalling data network design, checking and CRE to EN 50159, GRIP 4 to 8
- Secure OT architecture to IEC 62443-3-3: industrial DMZ, conduits, brokered remote access
- Resilient IP/MPLS operational networks, one VRF per system
- Cyber requirements for tenders and supplier assessment to IEC 62443-2-4
Our engineers install and commission it, in your outage window.
- Industrial firewalls, DMZs, data diodes, hardening
- Brokered vendor and remote access with MFA and session recording
- Supply, installation, FAT and SAT, commissioning in possessions and outages
- Verification against the security requirements, then handover
Rail, energy, oil and gas.
Core experience in rail. The same method and the same engineers on power, utility and process sites.
Rail & Metro
Signalling data networks, operational telecoms, traction power SCADA, control centres, stations and depots. IEC 62443, EN 50159, NIS.
What we do for railEnergy, Oil & Gas
Substation and electrification SCADA, utility telemetry, terminals, pipelines and process plants. Segmentation, vendor access and network build around outages and turnarounds.
What we do for energy, oil and gasNew to IPGS. Not new to critical networks.
- A zone gets a target security level before it gets a firewall.We decide how much protection each part of the network needs, to IEC 62443-3-2, before any control is chosen or bought.
- No change on a live network without a safety-case check and a rollback plan.Impact on the safety case and type approval is assessed first, and every change can be undone in the same window.
- No report without the bill of materials and the people to build it.Every assessment comes with a costed equipment list and the engineers to deliver it.
Discuss a requirement
Send the drawing, the audit finding or the project scope. An engineer will come back to you.