OT cyber security and critical networks for rail, energy, oil and gas.
Assessed, designed and built to IEC 62443 by operational network, SCADA and OT security engineers.
ISO 27001. ISO 9001. ISO 45001. Cyber Essentials Plus.
Information security, quality, health and safety, and UK government-backed cyber assurance, held by IP Global Services.
How an attacker reaches the trains, and what stops them.
Phishing on an office PC
Malware spreads across a flat network from the office to the SCADA server, then to the interlocking.
Compromised vendor laptop
A supplier's standing VPN account gives a route straight into the control system, past the firewall.
USB on an engineering laptop
The laptop has legitimate access to program the PLC. Segmentation lets it through, because it has to.
One team, accountable from design to handover.
On a railway or a plant, thirty-year-old equipment now shares its networks with new IP systems, and those networks connect to the office IT. Signalling, SCADA, telecoms and IT usually come from different suppliers, so when something goes wrong each one points at the others.
IPGS keeps one OT team that does the whole job: the same engineers assess the estate, design the network and commission it. Operational technology is a discipline of its own at IPGS, with its own engineers, not a sideline of the IT or telecoms business.
- We deliver itA defined scope under one contract, direct or through your prime contractor: from a signalling network design and CRE package to a full assess, design and build programme. Our engineers hold the design authority and sign the deliverables.
- We assure itOn the client's side: review and challenge of supplier designs, security requirements traced to evidence, risks stated plainly.
Assess. Design. Build.
Most OT security suppliers stop at the report. We design the network and we build it. Watch what each phase does to an estate.
What is connected, what is exposed, what to fix first.
- The estate mapped into zones, each with a target security level (IEC 62443-3-2)
- The risks ranked by what they would do to operations
- The network as built: how it is separated, where it would fail, who can get in remotely
- The evidence pack for a NIS / CAF assessment
How much protection each zone needs, and a network that provides it.
- Signalling data network design, checking and sign-off on resignalling schemes
- A secure architecture: a controlled boundary with the office network, each zone separated, remote access brokered (IEC 62443-3-3)
- Resilient IP networks for signalling, SCADA and voice, each system kept separate
- Cyber requirements for tenders, and suppliers assessed against them
Our engineers install and commission it, in your outage window.
- Firewalls, data diodes and hardened hosts
- Vendor remote access that is approved, time-limited and recorded
- Installation, testing and commissioning in possessions and outages
- Checked against the security requirements, then handed over
Rail, energy, oil and gas.
Core experience in rail. The same method and the same engineers on power, utility and process sites.
Rail & Metro
Signalling data networks, operational telecoms, traction power SCADA, control centres, stations and depots. IEC 62443, NIS, CSM-RA.
What we do for railEnergy, Oil & Gas
Substation and electrification SCADA, utility telemetry, terminals, pipelines and process plants. Segmentation, vendor access and network build around outages and turnarounds.
What we do for energy, oil and gasNew to IPGS. Not new to critical networks.
- A zone gets a target security level before it gets a firewall.We decide how much protection each part of the network needs, to IEC 62443-3-2, before any control is chosen or bought.
- No change on a live network without a safety-case check and a rollback plan.Impact on the safety case and type approval is assessed first, and every change can be undone in the same window.
- No report without the bill of materials and the people to build it.Every assessment comes with a costed equipment list and the engineers to deliver it.
Discuss a requirement
Send the drawing, the audit finding or the project scope. An engineer will come back to you.